All airlines flying from Orlando (MCO) to Phoenix Sky Harbor (PHX).

Ad box here 7322741189 I FlightInfo Top Box
Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Mon-Wed,Fri-Sun 07:12 Orlando (MCO) B 10:20 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2015 Non-stop Airbus A321neo (32Q) 5:08 Valid until 2026-01-05
Wed 07:30 Orlando (MCO) B 10:32 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2015 Non-stop Airbus A321 (321) 5:02 Effective 2026-02-18 through 2026-03-04
Sat 07:31 Orlando (MCO) B 10:38 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2015 Non-stop Airbus A321neo (32Q) 5:07 Effective 2026-02-14 through 2026-03-07
Mon,Tue,Thu,Fri,Sun 07:32 Orlando (MCO) B 10:39 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2015 Non-stop Airbus A321neo (32Q) 5:07 Effective 2026-02-12 through 2026-03-06
Mon,Tue,Thu-Sun 07:34 Orlando (MCO) B 09:38 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2015 Non-stop Airbus A321neo (32Q) 5:04 Effective 2026-03-08 through 2026-04-06
Daily 07:48 Orlando (MCO) B 09:39 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2015 Non-stop Airbus A321neo (32Q) 4:51 Effective 2026-04-07 through 2026-05-20
Daily 07:50 Orlando (MCO) B 09:39 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2015 Non-stop Airbus A321 (321) 4:49 Effective from 2026-10-05
Daily 08:03 Orlando (MCO) B 09:39 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2015 Non-stop Airbus A321neo (32Q) 4:36 Effective 2026-07-02 through 2026-08-04
Daily 08:08 Orlando (MCO) B 09:39 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2015 Non-stop Airbus A321neo (32Q) 4:31 Effective 2026-05-21 through 2026-07-01
Daily 18:23 Orlando (MCO) B 19:55 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2105 Non-stop Airbus A321 (321) 4:32 Effective 2026-05-21 through 2026-07-01
Daily 18:24 Orlando (MCO) B 19:55 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2110 Non-stop Airbus A321 (321) 4:31 Effective 2026-07-02 through 2026-08-04
Mon,Wed-Fri,Sun 17:40 Orlando (MCO) B 20:42 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2118 Non-stop Airbus A321 (321) 5:02 Effective 2026-02-12 through 2026-03-06
Daily 17:41 Orlando (MCO) B 19:40 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2118 Non-stop Airbus A321 (321) 4:59 Effective 2026-03-08 through 2026-04-06
Sat 11:05 Orlando (MCO) 12:40 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2167 Non-stop Boeing 737-800 (73H) 4:35 Effective 2026-08-08 through 2026-09-26
Mon,Thu,Fri 07:05 Orlando (MCO) 08:55 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2179 Non-stop Boeing 737 MAX 8 (7M8) 4:50 Effective 2026-04-09 through 2026-06-01
Daily 17:51 Orlando (MCO) B 19:14 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2226 Non-stop Airbus A321 (321) 4:23 Effective 2026-08-05 through 2026-09-08
Daily 18:11 Orlando (MCO) B 19:55 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2226 Non-stop Airbus A321 (321) 4:44 Effective from 2026-10-05
Daily 18:19 Orlando (MCO) B 19:55 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2226 Non-stop Airbus A321 (321) 4:36 Effective 2026-09-09 through 2026-10-04
Daily 11:03 Orlando (MCO) B 14:00 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2284 Non-stop Airbus A321 (321) 4:57 Effective 2026-01-06 through 2026-02-11
Wed 11:03 Orlando (MCO) B 14:10 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2284 Non-stop Airbus A321neo (32Q) 5:07 Effective 2026-02-18 through 2026-03-04
Wed 11:06 Orlando (MCO) B 13:10 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2284 Non-stop Airbus A321neo (32Q) 5:04 Effective 2026-03-11 through 2026-04-01
Mon,Tue,Thu-Sun 11:13 Orlando (MCO) B 13:10 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2284 Non-stop Airbus A321 (321) 4:57 Effective 2026-03-08 through 2026-04-06
Mon,Tue,Thu-Sun 11:15 Orlando (MCO) B 14:10 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2284 Non-stop Airbus A321 (321) 4:55 Effective 2026-02-12 through 2026-03-07
Sat 11:16 Orlando (MCO) B 14:10 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2284 Non-stop Boeing 737 MAX 8 (7M8) 4:54 Operates only on 2026-01-03
Mon-Fri,Sun 11:22 Orlando (MCO) B 14:10 Phoenix Sky Harbor (PHX) 4
American Airlines AA 2284 Non-stop Airbus A321 (321) 4:48 Valid until 2026-01-05
Tue,Wed 07:15 Orlando (MCO) 08:45 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2336 Non-stop Boeing 737-800 (73H) 4:30 Effective 2026-06-09 through 2026-07-29
Tue,Wed 06:40 Orlando (MCO) 08:45 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2360 Non-stop Boeing 737 MAX 8 (7M8) 5:05 Effective 2026-03-10 through 2026-04-01
Thu,Fri 07:00 Orlando (MCO) 10:05 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2360 Non-stop Boeing 737 MAX 8 (7M8) 5:05 Effective 2026-03-05 through 2026-03-06
Mon,Thu,Fri 07:00 Orlando (MCO) 09:05 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2360 Non-stop Boeing 737 MAX 8 (7M8) 5:05 Effective 2026-03-09 through 2026-04-06
Sun 09:40 Orlando (MCO) 11:45 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2360 Non-stop Boeing 737 MAX 8 (7M8) 5:05 Effective 2026-03-08 through 2026-04-05
Sat 10:10 Orlando (MCO) 13:20 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2360 Non-stop Boeing 737 MAX 8 (7M8) 5:10 Operates only on 2026-03-07
Sat 10:10 Orlando (MCO) 12:20 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2360 Non-stop Boeing 737 MAX 8 (7M8) 5:10 Effective 2026-03-14 through 2026-04-04
Mon,Thu,Fri 06:25 Orlando (MCO) 09:30 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2601 Non-stop Boeing 737 MAX 8 (7M8) 5:05 Effective 2026-02-12 through 2026-02-16
Thu,Fri,Sun 06:25 Orlando (MCO) 09:30 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2601 Non-stop Boeing 737 MAX 8 (7M8) 5:05 Effective 2026-02-20 through 2026-03-01
Sat 07:25 Orlando (MCO) 10:30 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2601 Non-stop Boeing 737 MAX 8 (7M8) 5:05 Effective 2026-02-14 through 2026-02-28
Tue,Wed 16:45 Orlando (MCO) 19:50 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2601 Non-stop Boeing 737-700 (Scimitar Winglets) 5:05 Effective 2026-02-10 through 2026-02-11
Tue,Wed 16:45 Orlando (MCO) 19:50 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2601 Non-stop Boeing 737-700 (Scimitar Winglets) 5:05 Effective 2026-02-18 through 2026-03-04
Mon-Fri 16:55 Orlando (MCO) 20:00 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2601 Non-stop Boeing 737-700 (Scimitar Winglets) 5:05 Effective 2026-01-06 through 2026-01-14
Tue-Fri,Sun 16:55 Orlando (MCO) 20:00 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2601 Non-stop Boeing 737-700 (Scimitar Winglets) 5:05 Effective 2026-01-18 through 2026-01-23
Mon-Fri 16:55 Orlando (MCO) 20:00 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2601 Non-stop Boeing 737-700 (Scimitar Winglets) 5:05 Effective 2026-01-26 through 2026-02-04
Sun 16:55 Orlando (MCO) 20:00 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2601 Non-stop Boeing 737-700 (Scimitar Winglets) 5:05 Operates only on 2026-02-08
Mon,Thu,Fri 13:35 Orlando (MCO) 16:40 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2602 Non-stop Boeing 737-700 (Scimitar Winglets) 5:05 Effective 2026-02-12 through 2026-02-16
Thu,Fri,Sun 13:35 Orlando (MCO) 16:40 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2602 Non-stop Boeing 737-700 (Scimitar Winglets) 5:05 Effective 2026-02-20 through 2026-03-01
Thu,Fri 20:15 Orlando (MCO) 23:20 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2603 Non-stop Boeing 737 MAX 8 (7M8) 5:05 Effective 2026-02-12 through 2026-02-13
Thu,Fri,Sun 20:15 Orlando (MCO) 23:20 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2603 Non-stop Boeing 737 MAX 8 (7M8) 5:05 Effective 2026-02-20 through 2026-03-01
Mon,Thu,Fri 06:45 Orlando (MCO) 08:10 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2628 Non-stop Boeing 737 MAX 8 (7M8) 4:25 Effective 2026-08-06 through 2026-09-28
Sun 10:05 Orlando (MCO) 11:40 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2628 Non-stop Boeing 737 MAX 8 (7M8) 4:35 Effective 2026-08-09 through 2026-09-27
Sat 13:20 Orlando (MCO) 14:50 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2629 Non-stop Boeing 737-800 (73H) 4:30 Effective 2026-08-08 through 2026-09-26
Mon,Thu,Fri 16:55 Orlando (MCO) 18:30 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2629 Non-stop Boeing 737-700 (Scimitar Winglets) 4:35 Effective 2026-08-06 through 2026-09-28
Tue,Wed 17:00 Orlando (MCO) 18:40 Phoenix Sky Harbor (PHX) 4
Southwest Airlines WN 2629 Non-stop Boeing 737 MAX 8 (7M8) 4:40 Effective 2026-08-04 through 2026-09-30
Ad flat here 8924483383 I FlightInfo Lower
Parallax here MCO-PHX
prev   1 2 3 4 5 6   next


All airlines flying from Orlando (MCO) to Phoenix Sky Harbor (PHX).
Ad mobi flat here (320x100px) 9629219771 M FlightInfo Top Flat
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Valid until 2026-01-05
Mon
Tue
Wed
Thu
-
Fri
Sat
Sun
Duration: 5:08, non-stop
Airbus A321neo (32Q)

Direct Flights:

Effective 2026-02-18 through 2026-03-04
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:02, non-stop
Airbus A321 (321)

Direct Flights:

Effective 2026-02-14 through 2026-03-07
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 5:07, non-stop
Airbus A321neo (32Q)

Direct Flights:

Effective 2026-02-12 through 2026-03-06
Mon
Tue
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:07, non-stop
Airbus A321neo (32Q)

Direct Flights:

Effective 2026-03-08 through 2026-04-06
Mon
Tue
Wed
-
Thu
Fri
Sat
Sun
Duration: 5:04, non-stop
Airbus A321neo (32Q)

Direct Flights:

Effective 2026-04-07 through 2026-05-20
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:51, non-stop
Airbus A321neo (32Q)

Direct Flights:

Effective from 2026-10-05
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:49, non-stop
Airbus A321 (321)

Direct Flights:

Effective 2026-07-02 through 2026-08-04
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:36, non-stop
Airbus A321neo (32Q)

Direct Flights:

Effective 2026-05-21 through 2026-07-01
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:31, non-stop
Airbus A321neo (32Q)

Direct Flights:

Effective 2026-05-21 through 2026-07-01
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:32, non-stop
Airbus A321 (321)

Direct Flights:

Effective 2026-07-02 through 2026-08-04
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:31, non-stop
Airbus A321 (321)

Direct Flights:

Effective 2026-02-12 through 2026-03-06
Mon
Tue
-
Wed
Thu
Fri
Sat
-
Sun
Duration: 5:02, non-stop
Airbus A321 (321)

Direct Flights:

Effective 2026-03-08 through 2026-04-06
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:59, non-stop
Airbus A321 (321)

Direct Flights:

Effective 2026-08-08 through 2026-09-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:35, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-04-09 through 2026-06-01
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 4:50, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-08-05 through 2026-09-08
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:23, non-stop
Airbus A321 (321)

Direct Flights:

Effective from 2026-10-05
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:44, non-stop
Airbus A321 (321)

Direct Flights:

Effective 2026-09-09 through 2026-10-04
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:36, non-stop
Airbus A321 (321)

Direct Flights:

Effective 2026-01-06 through 2026-02-11
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:57, non-stop
Airbus A321 (321)

Direct Flights:

Effective 2026-02-18 through 2026-03-04
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:07, non-stop
Airbus A321neo (32Q)

Direct Flights:

Effective 2026-03-11 through 2026-04-01
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:04, non-stop
Airbus A321neo (32Q)

Direct Flights:

Effective 2026-03-08 through 2026-04-06
Mon
Tue
Wed
-
Thu
Fri
Sat
Sun
Duration: 4:57, non-stop
Airbus A321 (321)

Direct Flights:

Effective 2026-02-12 through 2026-03-07
Mon
Tue
Wed
-
Thu
Fri
Sat
Sun
Duration: 4:55, non-stop
Airbus A321 (321)

Direct Flights:

Operates only on 2026-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:54, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Valid until 2026-01-05
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
Duration: 4:48, non-stop
Airbus A321 (321)

Direct Flights:

Effective 2026-06-09 through 2026-07-29
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:30, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-03-10 through 2026-04-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:05, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-03-05 through 2026-03-06
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 5:05, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-03-09 through 2026-04-06
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 5:05, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-03-08 through 2026-04-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:05, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Operates only on 2026-03-07
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 5:10, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-03-14 through 2026-04-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 5:10, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-02-12 through 2026-02-16
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 5:05, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-02-20 through 2026-03-01
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:05, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-02-14 through 2026-02-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 5:05, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-02-10 through 2026-02-11
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:05, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Effective 2026-02-18 through 2026-03-04
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:05, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Effective 2026-01-06 through 2026-01-14
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 5:05, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Effective 2026-01-18 through 2026-01-23
Mon
-
Tue
Wed
Thu
Fri
Sat
-
Sun
Duration: 5:05, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Effective 2026-01-26 through 2026-02-04
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 5:05, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Operates only on 2026-02-08
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:05, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Effective 2026-02-12 through 2026-02-16
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 5:05, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Effective 2026-02-20 through 2026-03-01
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:05, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Effective 2026-02-12 through 2026-02-13
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 5:05, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-02-20 through 2026-03-01
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:05, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-08-06 through 2026-09-28
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 4:25, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-08-09 through 2026-09-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:35, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-08-08 through 2026-09-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:30, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-08-06 through 2026-09-28
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 4:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Effective 2026-08-04 through 2026-09-30
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:40, non-stop
Boeing 737 MAX 8 (7M8)
Ad mobi box here (300x250px) 6815354179 M FlightInfo Bottom Box
Parallax here MCO-PHX
prev        Page 2 / 6        next
  • A domestic route departing from the Orlando airport (MCO) and arriving at Phoenix Sky Harbor airport (PHX).
  • The flight distance is 1843 miles, or 2966 km.
  • The timezone of the departure airport is UTC-5 , and the timezone of the arrival airport is UTC-7 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 4:23 and 5:17.