All airlines flying from Brisbane (BNE) to Townsville (TSV).

Ad box here 7322741189 I FlightInfo Top Box
Select flight date:
FLIGHT SCHEDULE
Direct Codeshare Flights:
Mon-Wed,Fri 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-04-21 through 2026-04-29
Codeshare flight, operated by Virgin Australia.(VA 393)
Mon-Fri 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-04-30 through 2026-05-18
Codeshare flight, operated by Virgin Australia.(VA 393)
Sun 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-05-03 through 2026-05-17
Codeshare flight, operated by Virgin Australia.(VA 393)
Tue,Sun 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-05-19 through 2026-05-24
Codeshare flight, operated by Virgin Australia.(VA 393)
Mon-Fri 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-05-20 through 2026-06-19
Codeshare flight, operated by Virgin Australia.(VA 393)
Sun 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-05-31 through 2026-06-21
Codeshare flight, operated by Virgin Australia.(VA 393)
Mon,Thu,Sun 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-06-22 through 2026-06-28
Codeshare flight, operated by Virgin Australia.(VA 393)
Mon-Wed,Fri 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-06-23 through 2026-07-01
Codeshare flight, operated by Virgin Australia.(VA 393)
Mon-Fri 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-07-02 through 2026-07-17
Codeshare flight, operated by Virgin Australia.(VA 393)
Sun 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-07-05 through 2026-07-19
Codeshare flight, operated by Virgin Australia.(VA 393)
Mon,Tue,Fri,Sun 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-07-20 through 2026-07-26
Codeshare flight, operated by Virgin Australia.(VA 393)
Mon,Wed,Thu 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-07-22 through 2026-07-30
Codeshare flight, operated by Virgin Australia.(VA 393)
Mon,Tue,Sun 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-07-28 through 2026-08-03
Codeshare flight, operated by Virgin Australia.(VA 393)
Tue-Fri 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-07-31 through 2026-08-06
Codeshare flight, operated by Virgin Australia.(VA 393)
Fri,Sun 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-08-07 through 2026-08-09
Codeshare flight, operated by Virgin Australia.(VA 393)
Mon-Fri 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-08-10 through 2026-08-24
Codeshare flight, operated by Virgin Australia.(VA 393)
Sun 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-08-16 through 2026-08-23
Codeshare flight, operated by Virgin Australia.(VA 393)
Tue,Fri,Sun 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-08-25 through 2026-08-30
Codeshare flight, operated by Virgin Australia.(VA 393)
Mon-Thu 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-08-26 through 2026-09-03
Codeshare flight, operated by Virgin Australia.(VA 393)
Mon-Fri 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-09-04 through 2026-10-23
Codeshare flight, operated by Virgin Australia.(VA 393)
Sun 14:35 Brisbane (BNE) D 16:45 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-09-06 through 2026-10-18
Codeshare flight, operated by Virgin Australia.(VA 393)
Sat 17:20 Brisbane (BNE) D 19:30 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-04-04 through 2026-10-24
Codeshare flight, operated by Virgin Australia.(VA 395)
Wed,Sat 17:50 Brisbane (BNE) D 19:55 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-800 (73H) 2:05 Valid until 2026-01-03
Codeshare flight, operated by Virgin Australia.(VA 395)
Sat 17:50 Brisbane (BNE) D 19:55 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-800 (73H) 2:05 Effective 2026-01-10 through 2026-01-24
Codeshare flight, operated by Virgin Australia.(VA 395)
Sat,Sun 17:50 Brisbane (BNE) D 19:55 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-800 (73H) 2:05 Effective 2026-01-25 through 2026-01-31
Codeshare flight, operated by Virgin Australia.(VA 395)
Sat 17:50 Brisbane (BNE) D 19:55 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-800 (73H) 2:05 Effective 2026-02-07 through 2026-03-28
Codeshare flight, operated by Virgin Australia.(VA 395)
Sun 17:50 Brisbane (BNE) D 20:00 Townsville (TSV)
Singapore Airlines SQ 6532 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2026-04-05
Codeshare flight, operated by Virgin Australia.(VA 395)
Mon-Sat 06:10 Brisbane (BNE) D 08:15 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-700 (73W) 2:05 Valid until 2026-01-12
Codeshare flight, operated by Virgin Australia.(VA 383)
Thu-Sat 06:10 Brisbane (BNE) D 08:15 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-700 (73W) 2:05 Effective 2026-01-15 through 2026-01-24
Codeshare flight, operated by Virgin Australia.(VA 383)
Mon 06:10 Brisbane (BNE) D 08:15 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-800 (73H) 2:05 Operates only on 2026-01-19
Codeshare flight, operated by Virgin Australia.(VA 383)
Mon,Tue,Thu,Fri 06:10 Brisbane (BNE) D 08:15 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-700 (73W) 2:05 Effective 2026-01-26 through 2026-01-30
Codeshare flight, operated by Virgin Australia.(VA 383)
Mon-Wed 06:10 Brisbane (BNE) D 08:15 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-800 (73H) 2:05 Effective 2026-01-28 through 2026-02-04
Codeshare flight, operated by Virgin Australia.(VA 383)
Mon-Fri 06:10 Brisbane (BNE) D 08:15 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-800 (73H) 2:05 Effective 2026-02-05 through 2026-02-27
Codeshare flight, operated by Virgin Australia.(VA 383)
Mon-Fri 06:10 Brisbane (BNE) D 08:15 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-700 (73W) 2:05 Effective 2026-03-02 through 2026-03-13
Codeshare flight, operated by Virgin Australia.(VA 383)
Sat 06:10 Brisbane (BNE) D 08:15 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-800 (73H) 2:05 Operates only on 2026-03-07
Codeshare flight, operated by Virgin Australia.(VA 383)
Mon-Sat 06:10 Brisbane (BNE) D 08:15 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-700 (73W) 2:05 Effective 2026-03-14 through 2026-03-28
Codeshare flight, operated by Virgin Australia.(VA 383)
Mon-Fri 06:10 Brisbane (BNE) D 08:20 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-03-30 through 2026-04-03
Codeshare flight, operated by Virgin Australia.(VA 383)
Mon,Fri 06:10 Brisbane (BNE) D 08:20 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-04-06 through 2026-06-26
Codeshare flight, operated by Virgin Australia.(VA 383)
Tue-Thu 06:10 Brisbane (BNE) D 08:20 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-04-07 through 2026-04-09
Codeshare flight, operated by Virgin Australia.(VA 383)
Tue 06:10 Brisbane (BNE) D 08:20 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2026-04-14
Codeshare flight, operated by Virgin Australia.(VA 383)
Tue-Thu 06:10 Brisbane (BNE) D 08:20 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-04-15 through 2026-06-25
Codeshare flight, operated by Virgin Australia.(VA 383)
Mon-Sat 06:10 Brisbane (BNE) D 08:20 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-06-29 through 2026-07-18
Codeshare flight, operated by Virgin Australia.(VA 383)
Mon,Fri 06:10 Brisbane (BNE) D 08:20 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-07-20 through 2026-09-11
Codeshare flight, operated by Virgin Australia.(VA 383)
Tue-Thu 06:10 Brisbane (BNE) D 08:20 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-07-21 through 2026-09-10
Codeshare flight, operated by Virgin Australia.(VA 383)
Mon-Fri 06:10 Brisbane (BNE) D 08:20 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-09-14 through 2026-10-23
Codeshare flight, operated by Virgin Australia.(VA 383)
Mon-Fri 06:10 Brisbane (BNE) D 08:15 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-800 (73H) 2:05 Effective from 2026-10-26
Codeshare flight, operated by Virgin Australia.(VA 383)
Sun 08:50 Brisbane (BNE) D 10:55 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-700 (73W) 2:05 Valid until 2026-01-11
Codeshare flight, operated by Virgin Australia.(VA 387)
Sun 08:50 Brisbane (BNE) D 10:55 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Fokker 100 (100) 2:05 Operates only on 2026-01-18
Codeshare flight, operated by Virgin Australia.(VA 387)
Sun 08:50 Brisbane (BNE) D 10:55 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-700 (73W) 2:05 Operates only on 2026-01-25
Codeshare flight, operated by Virgin Australia.(VA 387)
Sat,Sun 08:50 Brisbane (BNE) D 10:55 Townsville (TSV)
Singapore Airlines SQ 6534 Non-stop Boeing 737-800 (73H) 2:05 Effective 2026-01-31 through 2026-03-01
Codeshare flight, operated by Virgin Australia.(VA 387)
Ad flat here 8924483383 I FlightInfo Lower
Parallax here BNE-TSV
prev   1 2 3 ... 7 8 9 10 11 12 13 14   next


All airlines flying from Brisbane (BNE) to Townsville (TSV).
Ad mobi flat here (320x100px) 9629219771 M FlightInfo Top Flat
Select flight date:
FLIGHT SCHEDULE
Direct Codeshare Flights:

Effective 2026-04-21 through 2026-04-29
Mon
Tue
Wed
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-04-30 through 2026-05-18
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-05-03 through 2026-05-17
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective 2026-05-19 through 2026-05-24
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective 2026-05-20 through 2026-06-19
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-05-31 through 2026-06-21
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective 2026-06-22 through 2026-06-28
Mon
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective 2026-06-23 through 2026-07-01
Mon
Tue
Wed
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-07-02 through 2026-07-17
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-07-05 through 2026-07-19
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective 2026-07-20 through 2026-07-26
Mon
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective 2026-07-22 through 2026-07-30
Mon
Tue
-
Wed
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-07-28 through 2026-08-03
Mon
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective 2026-07-31 through 2026-08-06
Mon
-
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-08-07 through 2026-08-09
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective 2026-08-10 through 2026-08-24
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-08-16 through 2026-08-23
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective 2026-08-25 through 2026-08-30
Mon
-
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective 2026-08-26 through 2026-09-03
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-09-04 through 2026-10-23
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-09-06 through 2026-10-18
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Virgin Australia. (VA 393)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective 2026-04-04 through 2026-10-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 395)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Valid until 2026-01-03
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 395)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-01-10 through 2026-01-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 395)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-01-25 through 2026-01-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
Codeshare flight, operated by Virgin Australia. (VA 395)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-02-07 through 2026-03-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 395)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Operates only on 2026-04-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Virgin Australia. (VA 395)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Valid until 2026-01-12
Mon
Tue
Wed
Thu
Fri
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 383)
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective 2026-01-15 through 2026-01-24
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 383)
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Operates only on 2026-01-19
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 383)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-01-26 through 2026-01-30
Mon
Tue
Wed
-
Thu
Fri
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 383)
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective 2026-01-28 through 2026-02-04
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 383)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-02-05 through 2026-02-27
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 383)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-03-02 through 2026-03-13
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 383)
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Operates only on 2026-03-07
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 383)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-03-14 through 2026-03-28
Mon
Tue
Wed
Thu
Fri
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 383)
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective 2026-03-30 through 2026-04-03
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 383)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective 2026-04-06 through 2026-06-26
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 383)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-04-07 through 2026-04-09
Mon
-
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 383)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Operates only on 2026-04-14
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 383)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-04-15 through 2026-06-25
Mon
-
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 383)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective 2026-06-29 through 2026-07-18
Mon
Tue
Wed
Thu
Fri
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 383)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective 2026-07-20 through 2026-09-11
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 383)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Effective 2026-07-21 through 2026-09-10
Mon
-
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 383)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective 2026-09-14 through 2026-10-23
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 383)
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective from 2026-10-26
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 383)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Direct Codeshare Flights:

Valid until 2026-01-11
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Virgin Australia. (VA 387)
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Operates only on 2026-01-18
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Virgin Australia. (VA 387)
Duration: 2:05, non-stop
Fokker 100 (100)

Direct Codeshare Flights:

Operates only on 2026-01-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Virgin Australia. (VA 387)
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Direct Codeshare Flights:

Effective 2026-01-31 through 2026-03-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
Codeshare flight, operated by Virgin Australia. (VA 387)
Duration: 2:05, non-stop
Boeing 737-800 (73H)
Ad mobi box here (300x250px) 6815354179 M FlightInfo Bottom Box
Parallax here BNE-TSV
prev        Page 10 / 14        next
  • A domestic route departing from the Brisbane airport (BNE) and arriving at Townsville airport (TSV).
  • The flight distance is 692 miles, or 1113 km.
  • The timezone of both the departure and the arrival airports is UTC+10 . Current time at both airports is (loading...).
  • For direct flights, the flight time varies between 2:00 and 2:15.