FLIGHT SCHEDULE |
---|
Direct Codeshare Flights: |
Sat
13:40
San Jose del Cabo (SJD) 2
20:47
Atlanta (ATL) I VS 2981 Non-stop Boeing 737-900 (739) 4:07 Effective 2025-07-12 through 2025-08-02 Codeshare flight, operated by Delta Air Lines.(DL 1608) |
Sat
13:40
San Jose del Cabo (SJD) 2
20:33
Atlanta (ATL) I VS 2981 Non-stop Boeing 737-900 (739) 3:53 Effective 2025-10-11 through 2025-11-01 Codeshare flight, operated by Delta Air Lines.(DL 199) |
Sat
13:42
San Jose del Cabo (SJD) 2
20:48
Atlanta (ATL) I VS 2981 Non-stop Boeing 737-900 (739) 4:06 Effective 2025-06-14 through 2025-07-05 Codeshare flight, operated by Delta Air Lines.(DL 1608) |
Sat
13:48
San Jose del Cabo (SJD) 2
20:40
Atlanta (ATL) I VS 2981 Non-stop Boeing 737-900 (739) 3:52 Effective 2025-05-10 through 2025-06-07 Codeshare flight, operated by Delta Air Lines.(DL 1828) |
Sat
14:10
San Jose del Cabo (SJD) 2
20:58
Atlanta (ATL) I VS 2981 Non-stop Boeing 737-900 (739) 3:48 Operates only on 2025-05-03 Codeshare flight, operated by Delta Air Lines.(DL 1828) |
Sat
14:45
San Jose del Cabo (SJD) 2
20:30
Atlanta (ATL) I VS 2981 Non-stop Boeing 757 (757) 3:45 Effective 2025-11-08 through 2025-12-13 Codeshare flight, operated by Delta Air Lines.(DL 1828) |
Mon,Thu-Sun
15:05
San Jose del Cabo (SJD) 2
20:50
Atlanta (ATL) I VS 2981 Non-stop Boeing 737-900 (739) 3:45 Effective 2026-01-08 through 2026-02-16 Codeshare flight, operated by Delta Air Lines.(DL 1828) |
Daily
15:05
San Jose del Cabo (SJD) 2
20:50
Atlanta (ATL) I VS 2981 Non-stop Boeing 737-900 (739) 3:45 Effective from 2026-02-17 Codeshare flight, operated by Delta Air Lines.(DL 1828) |
Daily
15:10
San Jose del Cabo (SJD) 2
21:05
Atlanta (ATL) I VS 2981 Non-stop Boeing 757 (757) 3:55 Effective 2025-12-20 through 2026-01-05 Codeshare flight, operated by Delta Air Lines.(DL 1828) |