FLIGHT SCHEDULE |
---|
Direct Codeshare Flights: |
Sat
11:05
Atlanta (ATL) I
12:25
San Jose del Cabo (SJD) 2 VS 2150 Non-stop Boeing 737-900 (739) 4:20 Effective 2025-10-11 through 2025-11-01 Codeshare flight, operated by Delta Air Lines.(DL 1945) |
Sat
11:05
Atlanta (ATL) I
13:36
San Jose del Cabo (SJD) 2 VS 2150 Non-stop Boeing 757 (757) 4:31 Effective 2025-11-08 through 2025-12-13 Codeshare flight, operated by Delta Air Lines.(DL 1945) |
Mon,Thu-Sun
11:20
Atlanta (ATL) I
14:00
San Jose del Cabo (SJD) 2 VS 2150 Non-stop Boeing 737-900 (739) 4:40 Effective 2026-01-08 through 2026-02-16 Codeshare flight, operated by Delta Air Lines.(DL 1945) |
Daily
11:20
Atlanta (ATL) I
14:00
San Jose del Cabo (SJD) 2 VS 2150 Non-stop Boeing 737-900 (739) 4:40 Effective from 2026-02-17 Codeshare flight, operated by Delta Air Lines.(DL 1945) |
Daily
11:24
Atlanta (ATL) I
13:52
San Jose del Cabo (SJD) 2 VS 2150 Non-stop Boeing 757 (757) 4:28 Effective 2025-12-20 through 2026-01-05 Codeshare flight, operated by Delta Air Lines.(DL 1945) |
Sat
11:27
Atlanta (ATL) I
12:43
San Jose del Cabo (SJD) 2 VS 2150 Non-stop Boeing 737-900 (739) 4:16 Effective 2025-05-10 through 2025-06-07 Codeshare flight, operated by Delta Air Lines.(DL 1945) |
Sat
11:33
Atlanta (ATL) I
12:37
San Jose del Cabo (SJD) 2 VS 2150 Non-stop Boeing 737-900 (739) 4:04 Effective 2025-06-14 through 2025-07-05 Codeshare flight, operated by Delta Air Lines.(DL 396) |
Sat
11:38
Atlanta (ATL) I
12:40
San Jose del Cabo (SJD) 2 VS 2150 Non-stop Boeing 737-900 (739) 4:02 Effective 2025-07-12 through 2025-08-02 Codeshare flight, operated by Delta Air Lines.(DL 396) |
Sat
11:40
Atlanta (ATL) I
13:05
San Jose del Cabo (SJD) 2 VS 2150 Non-stop Boeing 737-900 (739) 4:25 Operates only on 2025-05-03 Codeshare flight, operated by Delta Air Lines.(DL 1945) |